Formats  › Site Execution  › Plaster Inspection Checklist
Checklist · FMT-SIT-019
Plaster Inspection Checklist
11 fields across 3 sections. Inspect per wall / per area — typically after 7-day curing and before painting.
11 Fields
3 Sections
Per area / daily
Site Supervisor, QC Engineer

Format Preview

S.No.Field / CheckpointReferenceStatus
A. SUBSTRATE PREPARATION
A1Surface cleaning — loose mortar, dust, grease removed
Acceptance: Surface sound
IS 1661 Cl. 4.1
OK
NC
NA
A2Hacking on concrete surfaces — depth 3mm, density 100/m²
Acceptance: Hacking visible
Mechanical bond for plaster on concrete
OK
NC
NA
A3Wetting before plastering — surface damp not soaking
Acceptance: Wetted 30 min prior
IS 1661 Cl. 4.2
OK
NC
NA
B. PLASTER MIX + APPLICATION
B1Mix ratio — 1:4 internal / 1:6 external (cement:sand) typical
Acceptance: Volumetric batching
Per drawing / spec
OK
NC
NA
B2Sand — IS 1542 grade, silt < 5%, FM 1.2-2.2
Acceptance: Lab report
Pre-tested
OK
NC
NA
B3Plaster thickness 12-20mm internal, 15-25mm external
Acceptance: Marked + verified
IS 1661 Cl. 5
OK
NC
NA
B4Applied in 1 or 2 coats per spec
Acceptance: Coat thickness uniform
Per drawing
OK
NC
NA
C. FINISH + CURING
C1Surface plumb + true to line — deviation ≤ 3mm per 2m
Acceptance: Straight edge verified
IS 1661
OK
NC
NA
C2Wooden float / sponge finish per spec
Acceptance: Finish uniform
Per drawing
OK
NC
NA
C3Curing for 7 days from 24 hrs after application
Acceptance: Wet curing
IS 1661 Cl. 6
OK
NC
NA
C4Cracks (hairline / shrinkage) inspected + repaired
Acceptance: Repairs documented
Acceptance: no cracks > 1mm wide
OK
NC
NA
A. SUBSTRATE PREPARATION
A1Surface cleaning — loose mortar, dust, grease removed
IS 1661 Cl. 4.1
Surface sound
OKNCNA
A2Hacking on concrete surfaces — depth 3mm, density 100/m²
Mechanical bond for plaster on concrete
Hacking visible
OKNCNA
A3Wetting before plastering — surface damp not soaking
IS 1661 Cl. 4.2
Wetted 30 min prior
OKNCNA
B. PLASTER MIX + APPLICATION
B1Mix ratio — 1:4 internal / 1:6 external (cement:sand) typical
Per drawing / spec
Volumetric batching
OKNCNA
B2Sand — IS 1542 grade, silt < 5%, FM 1.2-2.2
Pre-tested
Lab report
OKNCNA
B3Plaster thickness 12-20mm internal, 15-25mm external
IS 1661 Cl. 5
Marked + verified
OKNCNA
B4Applied in 1 or 2 coats per spec
Per drawing
Coat thickness uniform
OKNCNA
C. FINISH + CURING
C1Surface plumb + true to line — deviation ≤ 3mm per 2m
IS 1661
Straight edge verified
OKNCNA
C2Wooden float / sponge finish per spec
Per drawing
Finish uniform
OKNCNA
C3Curing for 7 days from 24 hrs after application
IS 1661 Cl. 6
Wet curing
OKNCNA
C4Cracks (hairline / shrinkage) inspected + repaired
Acceptance: no cracks > 1mm wide
Repairs documented
OKNCNA
Approval / Sign-Off
APPROVED
HOLD — REVISIONS REQUIRED
REJECTED
Overall Verdict
Name / Sign / Date
Prepared By — Name / Sign
Name / Sign / Date
Reviewed By — Name / Sign
Name / Sign / Date
Approved By — Name / Sign
Name / Sign / Date
Date & Time
Name / Sign / Date
Remarks
Name / Sign / Date