S.No.Field / CheckpointReferenceStatus
A. MATERIAL
A1Brick — Class designation, source, IS 1077 / IS 12894 conformity
Acceptance: MTC + ISI mark verified
Class 7.5/10/12.5 N/mm² as per drawing
OK
NC
NA
A2Brick soaking — fully soaked min 2 hrs before laying
Acceptance: No dry brick used
IS 2212 Cl. 4
OK
NC
NA
A3Mortar — cement-sand ratio per drawing (1:4 / 1:6 typical)
Acceptance: Volumetric measurement
Per design
OK
NC
NA
A4Sand — IS 383 zone II/III, silt < 5%
Acceptance: Lab report
Pre-tested
OK
NC
NA
B. WORKMANSHIP
B1Bond pattern — English / Flemish / stretcher as specified
Acceptance: Bond uniform
Per drawing
OK
NC
NA
B2Mortar joint thickness 10 ± 3mm
Acceptance: Joint full + tight
IS 2212 Cl. 5
OK
NC
NA
B3Plumb + verticality ± 6mm per 3m height
Acceptance: Spirit level checked at 3m intervals
IS 2212
OK
NC
NA
B4Course leveling ± 3mm per 1m run
Acceptance: Spirit level verified
IS 2212
OK
NC
NA
B5Maximum height per day — 1.0m (4 ft) typical
Acceptance: Limit enforced
Prevent mortar squeezing
OK
NC
NA
C. CURING + TOOTHING
C1Curing started within 24 hrs + continued 7 days
Acceptance: Wet sponging or spraying
IS 2212 Cl. 6
OK
NC
NA
C2Toothing at junctions for future bonding
Acceptance: Toothing provided
IS 2212
OK
NC
NA
C3Lintel bearings ≥ 150mm + RCC band at 1.2m, 2.4m height
Acceptance: Per drawing
IS 1905 / IS 13828 for seismic
OK
NC
NA
A. MATERIAL
A1Brick — Class designation, source, IS 1077 / IS 12894 conformity
Class 7.5/10/12.5 N/mm² as per drawing
MTC + ISI mark verified
OKNCNA
A2Brick soaking — fully soaked min 2 hrs before laying
IS 2212 Cl. 4
No dry brick used
OKNCNA
A3Mortar — cement-sand ratio per drawing (1:4 / 1:6 typical)
Per design
Volumetric measurement
OKNCNA
A4Sand — IS 383 zone II/III, silt < 5%
Pre-tested
Lab report
OKNCNA
B. WORKMANSHIP
B1Bond pattern — English / Flemish / stretcher as specified
Per drawing
Bond uniform
OKNCNA
B2Mortar joint thickness 10 ± 3mm
IS 2212 Cl. 5
Joint full + tight
OKNCNA
B3Plumb + verticality ± 6mm per 3m height
IS 2212
Spirit level checked at 3m intervals
OKNCNA
B4Course leveling ± 3mm per 1m run
IS 2212
Spirit level verified
OKNCNA
B5Maximum height per day — 1.0m (4 ft) typical
Prevent mortar squeezing
Limit enforced
OKNCNA
C. CURING + TOOTHING
C1Curing started within 24 hrs + continued 7 days
IS 2212 Cl. 6
Wet sponging or spraying
OKNCNA
C2Toothing at junctions for future bonding
IS 2212
Toothing provided
OKNCNA
C3Lintel bearings ≥ 150mm + RCC band at 1.2m, 2.4m height
IS 1905 / IS 13828 for seismic
Per drawing
OKNCNA
Approval / Sign-Off
APPROVED
HOLD — REVISIONS REQUIRED
REJECTED
Overall Verdict
Name / Sign / Date
Prepared By — Name / Sign
Name / Sign / Date
Reviewed By — Name / Sign
Name / Sign / Date
Approved By — Name / Sign
Name / Sign / Date
Date & Time
Name / Sign / Date
Remarks
Name / Sign / Date