📍 When to use this template
- When a site engineer or supervisor needs materials for a specific construction activity like concreting, brickwork, or plastering.
- Typically raised 24-48 hours before the material is required at the work location to allow for processing and delivery.
- Filled by the Site Engineer/Supervisor, verified by the Section In-charge, and approved by the Project Manager before being sent to the Stores department.
Sections & fields
Preview of the template structure. Download Excel to fill on site.
1Header Information6 fields
Project Name
_____________
Contract Package No.
_____________
Indent Number
_____________
Date of Indent
_____________
Raised By (Name & Designation)
_____________
Approved By (Name & Designation)
_____________
2Material Requirement Details9 fields
Material Description (as per BOQ/Specs)
_____________
Material Code (if applicable)
_____________
Make / Brand (if specified)
_____________
Unit of Measurement (UoM)
_____________
BOQ Item No.
_____________
Required Quantity
_____________
Required Date
_____________
Location of Use (e.g., Tower A, 5th Floor Slab / Chainage 1+250)
_____________
3Stock Position & Justification4 fields
Current Stock at Site (for this material)
_____________
Stock in Main Store (if known)
_____________
Work Activity Reference (e.g., Slab S-101 casting)
_____________
Justification / Remarks
_____________
4For Stores Department Use Only9 fields
Issued Quantity
_____________
Balance Quantity to be Issued
_____________
Date of Issue
_____________
Issued By (Storekeeper Name & Sign)
_____________
Received By (Site Representative Name & Sign)
_____________
Delivery Challan / Gate Pass No.
_____________
Ledger Folio No.
_____________
Remarks (e.g., Partial issue)
_____________
5For Procurement Department Use Only (If material is not in stock)5 fields
Action Taken (e.g., Forwarded to Purchase)
_____________
Purchase Requisition (PR) No. Generated
_____________
Expected Delivery Date (EDD)
_____________
Procurement Officer Name
_____________
💡 Sample filled excerpt
Indent No: IND/PKG-2/2024/115
Material Description: TMT Reinforcement Steel, Fe 500D, 16mm dia (As per IS 1786)
Required Quantity: 8.5 MT
Location of Use: Bridge Pier P4, Foundation Raft
⚖ Compliance notes
- Fulfills contractor's obligation under FIDIC Sub-Clause 4.1 (Contractor's General Obligations) to provide materials.
- Acts as a primary document for internal audits and for preparing Material Reconciliation Statements required for RA Bills.
- Ensures traceability of materials from store to specific work location, which is crucial for quality control and consumption monitoring.
- Helps in managing inventory and preventing wastage or theft, a key aspect of project cost control.