WTP — Rapid Sand Filter (5-50 m³/hr)

Conventional rapid sand filter unit per CPHEEO Manual + IS 8419. RCC filter box + filter media (graded sand + gravel) + underdrain laterals + wash-water trough + valves + chlorination. Standard small-WTP design for JJM surface-water schemes (capacity 5-50 m³/hr). Rates: CPWD DSR Vol 1 (2023) + CPWD DSR Vol 2 (2023) + mjp_ssr_2024.

Visual confirmation
Visual schematics coming soon for this template.
Bill of Quantities16 items · CPWD DSR Vol 1 (2023) + CPWD DSR Vol 2 (2023) + mjp_ssr_2024
#CodeDescriptionUnitQtyRate (₹)Amount (₹)
12.8.1ExcavationEarth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. — All kinds of soil.Cum27.27260.307,098.38
24.1.8Pcc BedProviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : — 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)Cum0.646,812.004,359.68
35.1.2Rcc RaftProviding and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : — 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)Cum1.499,045.7513,478.17
45.9.1Shutter RaftCentering and shuttering including strutting, propping etc. and removal of form for — Foundations, footings, bases of columns, etc. for mass concreteSqm4.98392.151,952.91
55.2.2Rcc WallsReinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : — 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)Cum5.2010,852.9556,435.34
65.9.2Shutter WallsCentering and shuttering including strutting, propping etc. and removal of form for — Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.Sqm47.57842.5040,077.73
75.22.6SteelSteel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. — Thermo-Mechanically Treated bars of grade Fe-500D or more.Kg869.80107.8593,807.93
822.5Internal WaterproofProviding and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : (a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours. (b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.Sqm23.78617.0514,673.45
9RSF.SAND.GRDFilter SandRSF filter sand graded.2.254,200.009,450.00
10RSF.GRAVEL.GRDFilter GravelRSF filter gravel graded.1.353,100.004,185.00
11RSF.UNDERDRAINUnderdrain SystemUnderdrain system per m².3.004,800.0014,400.00
12RSF.TROUGHWash Water TroughWash-water trough.m3.462,400.008,304.00
13RSF.VALVES.SETValve SetRSF valve set.LS1.0095,000.0095,000.00
14RSF.CHLORChlorinatorWTP chlorinator.LS1.0065,000.0065,000.00
15RSF.ALUM.DOSEAlum DosingAlum dosing system.LS1.0055,000.0055,000.00
16RSF.PIPING.SETInterconnect PipingWTP piping.LS1.001,25,000.001,25,000.00
Your inputsFilter capacity 15 m³/hr · Filtration rate 5 m³/m²/hr · Filter box int. depth 3 m · Wall thk 250 mm · Flash mixer chamber · Clarifier chamber upstream of filter · Clear-water sump downstreamTOTAL₹6,08,223
12.8.1₹7,098
Excavation
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. — All kinds of soil.
27.27 Cum× ₹260.30
24.1.8₹4,360
Pcc Bed
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : — 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
0.64 Cum× ₹6,812.00
35.1.2₹13,478
Rcc Raft
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : — 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
1.49 Cum× ₹9,045.75
45.9.1₹1,953
Shutter Raft
Centering and shuttering including strutting, propping etc. and removal of form for — Foundations, footings, bases of columns, etc. for mass concrete
4.98 Sqm× ₹392.15
55.2.2₹56,435
Rcc Walls
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : — 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.20 Cum× ₹10,852.95
65.9.2₹40,078
Shutter Walls
Centering and shuttering including strutting, propping etc. and removal of form for — Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
47.57 Sqm× ₹842.50
75.22.6₹93,808
Steel
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. — Thermo-Mechanically Treated bars of grade Fe-500D or more.
869.80 Kg× ₹107.85
822.5₹14,673
Internal Waterproof
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : (a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours. (b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.
23.78 Sqm× ₹617.05
9RSF.SAND.GRD₹9,450
Filter Sand
RSF filter sand graded.
2.25 × ₹4,200.00
10RSF.GRAVEL.GRD₹4,185
Filter Gravel
RSF filter gravel graded.
1.35 × ₹3,100.00
11RSF.UNDERDRAIN₹14,400
Underdrain System
Underdrain system per m².
3.00 × ₹4,800.00
12RSF.TROUGH₹8,304
Wash Water Trough
Wash-water trough.
3.46 m× ₹2,400.00
13RSF.VALVES.SET₹95,000
Valve Set
RSF valve set.
1.00 LS× ₹95,000.00
14RSF.CHLOR₹65,000
Chlorinator
WTP chlorinator.
1.00 LS× ₹65,000.00
15RSF.ALUM.DOSE₹55,000
Alum Dosing
Alum dosing system.
1.00 LS× ₹55,000.00
16RSF.PIPING.SET₹1,25,000
Interconnect Piping
WTP piping.
1.00 LS× ₹1,25,000.00
Filter capacity 15 m³/hr · Filtration rate 5 m³/m²/hr · Filter box int. depth 3 m · Wall thk 250 mm · Flash mixer chamber · Clarifier chamber upstream of filter · Clear-water sump downstream
Estimated total
₹6,08,223
Notes & assumptions
  • Rates sourced from MJP SSR 2023-24 (with 2024-25 escalation column). 5 corrigenda dated up to 20-Dec-2024 exist (mjp.maharashtra.gov.in publications page) but are scanned-image PDFs in Marathi requiring manual review for tender-grade use. For cost feasibility this Builder is good as-is; for tender submission, cross-check each item against the latest corrigendum.
  • JJM Village Water Supply standard: 15 m³/hr filter for ~350 HH at 135 lpcd + 8-hour pumping. Smaller (5-10 m³/hr) for hamlets; larger (25-50 m³/hr) for cluster schemes.
  • Filtration rate is the design parameter: standard 5 m³/m²/hr per CPHEEO + IS 8419. Going up to 6 reduces filter area + cost but needs better pre-treatment (flash mix + clarifier mandatory).
  • Filter media gradation per IS 8419: top 600 mm = sharp filter sand (effective size 0.45-0.55 mm, uniformity coefficient < 1.65). Below: graded gravel 30 + 50 + 75 + 100 mm in 4 layers of 75-150 mm each totalling ~450 mm.
  • Underdrain system: perforated pipe laterals on header pipe, or false-bottom strainer plates with nozzles. CPHEEO Manual prefers strainer false-bottom for ease of backwash but pipe laterals are cheaper.
  • Flash mixer: 30-60 second detention time for alum + lime dosing. Tiny chamber, typically 0.5 m³ for 15 m³/hr capacity.
  • Clarifier (clari-flocculator): 2-3 hour detention. For 15 m³/hr that's 30-45 m³ tank — substantial structure, often a clari-flocculator with mechanical flash + flocc paddle.
  • Clear-water reservoir (CWR) downstream: 3-hour storage minimum per CPHEEO. For 15 m³/hr that's 45 m³ tank. Use the [UGSR Water Tank BOQ Builder](/boq/ugsr-water-tank) for the CWR civil estimate — quote separately.
  • Excludes: filter house structure (brick walls + RCC roof on top of filter box, +30-40% to civil cost); chlorine cylinder storage room; electrical panels + cabling; pumps (raw-water + clear-water + backwash); chemical storage tanks (alum + lime + chlorine); operator's room + lab; access road; boundary wall + landscaping.

**Rapid Sand Filter (RSF)** is the dominant water-treatment technology for small + medium water-supply systems in India — every JJM surface-water scheme, every state PHED village WTP uses it. The CPHEEO Manual + IS 8419 standard configuration: rectangular RCC filter box with graded sand-on-gravel media bed, underdrain system, wash-water trough, valve gallery for backwash control, and chlorine dosing for disinfection. Typical capacity 5-50 m³/hr for village schemes. This Builder generates the complete cost per CPWD DSR 2023 for civil + CPHEEO Manual + state PHED placeholder rates for filter media and valves.

How a Rapid Sand Filter works

Raw water (after clarification + alum dosing) flows downward through 600 mm of graded sand resting on 450 mm of graded gravel. Suspended particles + flocs are trapped in the top sand layer. Underdrain at the bottom collects filtered water + sends it to the clear-water sump for chlorination. Every 24-48 hours (depending on raw-water quality), the filter is BACKWASHED — clean water + air pumped upward through the bed at 4-6× normal flow, fluidising the sand and washing out trapped solids. Wash water (containing the dirt) flows over the wash-water troughs to a drain. Cycle repeats. With proper maintenance, filter media lasts 2-3 years before replacement.

Treatment train: flash mix + clari + RSF + chlorine

Complete small-WTP train: (1) **Flash mixer** — 30-60s detention, alum + lime dosed inline; (2) **Clari-flocculator** — 2-3 hr detention, slow paddles agitate to grow flocs that settle out; (3) **RSF** — current article ⤴, polishes remaining particles; (4) **Chlorine dosing** in the inlet of clear-water sump; (5) **CWR** — 3-hr storage downstream of filter. Skipping the clari (going directly raw → flash → RSF) is acceptable for low-turbidity (< 30 NTU) sources but the filter media has to be backwashed twice as often. JJM specifies the full train for any source with turbidity > 30 NTU.

Disclaimer: Rates sourced from CPWD DSR Vol 1 (2023) + CPWD DSR Vol 2 (2023) + mjp_ssr_2024. Indicative for estimation only — actual tender quotations are governed by market forces, locality factors and current input prices. Quantities follow IS 1200 measurement. Always verify with a local quote before finalising. © InfraLens — infralens.in